Critical Summary On January 13, 1978, Mr. Robert Allen, a field sales engineer of Lawford Electric Company learned from a phone call with Mr. George Gibson, purchasing agent of Bayfield Milling Company that Bayfield was interested in purchasing a drive system for a new shearing line. The cost of the new shearing line that Bayfield recently ordered from Magna Machinery Corporation was about $2 million and the drive system was going to cost roughly another $900 thousand dollars. The shearing line recently ordered by Bayfield would add new capability and value to Bayfield’s mill operation. Per Gibson, the preliminary bids on the drive system for the shearing line were due on July 14, 1978. Final bids were due on December 29, 1978 and decision on which company had won the bid to be announced on February 2, 1979, approximately about a year from the time of Mr. Allen’s initial phone conversation with Mr. Gibson.
This drive system was an $871,000 order and it was not an ordinary size order considering that Bayfield’s annual sales from Lawford occasionally totaled as much as only $50,000. Mr. Gibson also specified to Mr. Allen that no supplier sales personnel including staff and management were to contact Bayfield engineering personnel to discuss product specification. Instead, all supplier personnel were to work through Mr. Gibson, although contact was permitted with operations personnel. However, Gibson did give the name of the Megna engineer to contact for details of the new line. Mr. Allen also learned that the decision makers for the purchase of the drive system for the new shearing line would be made by Gibson, Lorenz, chief engineer; Mainwaring, plant superintendent; and Vogel, operations vice president – also not be contacted in person. On February 2, 1978, Mr. Allen learned from his meeting with Gibson and lunch with Mainwaring and his assistant, Hughes, there was an issue with drive system specs, and nobody in operations

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Some employers use multiple tests and other selection procedures to hire applicants and to promote employees. Interviewing, job knowledge tests, integrity tests, cognitive tests, personality tests, medical examinations, credit checks, and criminal background checks are some examples of tests administered for selection decisions. The use of these tests can be extremely effective when determining who is the most qualified for the particular position, however it is deemed discriminatory if they are used to discriminate based on race, color, sex, national origin, religion, disability or age.…

    • 315 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    The service has been requested by COO of Riordan Manufacturing, Hugh McCauley to Smith Services Consulting. The expected result from Smith Services Consulting is to “Define the…

    • 769 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Learning Task 3

    • 322 Words
    • 2 Pages

    Asset #5—Assembly Line—Henry purchased an assembly line on January 15, 2011 for $400,000. The line will be depreciated using the units of activity method of depreciation. The line has no salvage value and…

    • 322 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Space Age Furniture

    • 1300 Words
    • 6 Pages

    There have been special constrains in the case study placed on the operations manager which entail correcting the problem in the most cost effective manner possible for part 3079. The issue of overtime must be addressed in conjunction with operation of the lathe. There will have to be a analysis of the demand must be viewed thoroughly. The analysis will look at the total of two thousand units of part 3,079 that has to be created to meet the orders for Genesis and Saturn…

    • 1300 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    HOWARD LEVIER 404 Pacific Street, Port Barre, La 70577 337-351- 9269 I hjlevier@gmail.com SUMMARY, HIGHLIGHTS & ACCOMPLISHMENTS Summary: Well experienced Solid Control Technician with solid work history and proven ability to perform well in a team and individually. Highlights: Strategic thinker Initiative to work independently Certified Forklift Operator Accomplishments: Problem Diagnosis Used operational knowledge of systems, parts and components to solve problems that arose during assembly.…

    • 264 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Author: Clayton, Chris Publication info: Knight Ridder Tribune Business News [Washington] 03 Feb 2004: 1. ProQuest document link Abstract: [Gary Hellerich] used information from the tractor…

    • 1572 Words
    • 7 Pages
    Better Essays
  • Powerful Essays

    Should the Pittston Coal Company be held liable for the emotional damages and psychic impairments of the plaintiffs?…

    • 1539 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    Energy Inc. case

    • 1469 Words
    • 6 Pages

    Energy Inc. has a present obligation (IAS 37-17) and probable liability (ASC 450-20-25-2) on December 31, 2011 as a result of a past event, the contamination of the land, because it is virtually certain that a draft law requiring cleaning up will be enacted. It is probable (more likely than not) that Energy Inc. will be required to transfer economic benefits in settlement which is an outflow of resources embodying economic benefits in settlement (IAS 37-23). The amount of the obligation or loss can also be estimated reliably since Energy Inc. has made similar payments for cleanup in other countries, which is the best estimate of the costs of the clean (IAS 37-36/ASC 450-20-25-2). As a result, according to IAS 37-14, Energy Inc. should recognize a provision in reporting to its U.K. parent under IFRSs and based on ASC 450-20-25-2, a provision needs to be recognized in reporting to its U.S.-based lender in accordance with U.S. GAAP as of December 31, 2011. However, in the case that Energy Inc. cannot reasonably estimate the cost of the cleanup, a provision should not be recognized but disclosed provision in reporting to its U.K. parent under IFRSs and U.S.-based lender in accordance with U.S. GAAP (ASC 450-20-50-5).…

    • 1469 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    Waldo

    • 694 Words
    • 3 Pages

    At the present time, ATC is considering an upgrade to its manufacturing facility. This will involve replacing several older machines by the purchase and installation of a new, state of the art, computer-controlled metal cutting and shaping machine center made by a German supplier. Estimates of the machine center’s costs and benefits are shown in the table below. Although the machinery should last for at least ten years, the company uses a five-year planning period for equipment of this type (based on depreciation rules and company policy). Since the machine will not be sold at the end of year 5, there is no salvage value to consider.…

    • 694 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The questions for the Hampton Machine Tool Company are given below. Please prepare for submission…

    • 492 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Cooper Case

    • 1578 Words
    • 7 Pages

    Cooper was interested in Nicholson because of its competitive strength in the hand tools industry. Nicholson had a 50% share for files and wraps with a very strong brand name and high quality line. It also had a 9% share of the 200 million handsaws and saw blades market with excellent brand & quality. It had a very effective and large distribution system across US, Canada and overseas. Cooper industries believed that Nicholson can achieve 6% annual sales growth and also bring down the cost of goods sold from 69% to 65% and selling and administrative expenses from 22% to 19%, thereby increasing its profitability. Cooper would be able to use Nicholson’s distribution system to cross sell Cooper’s hand tool lines in the industrial and consumer markets.…

    • 1578 Words
    • 7 Pages
    Good Essays
  • Powerful Essays

    4. When checking the draft contract received from Greensward & Co., what will yoube looking for and why? (15 marks)…

    • 1558 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    Worldwide Paper

    • 1938 Words
    • 6 Pages

    The project would provide Blue Ridge Mill with a new longwood yard, giving the mill the ability to produce shortwood, a required input for paper production, from longwood. The project would also product excess shortwood that would allow Blue Ridge Mill to sell shortwood as an additional revenue source, competing with their current shortwood supplier. Construction for project would begin in 2007 and production would begin in 2008. The project will cost $18 million, with $16 million in 2007 and an additional $2 million in 2008. The $18 million investment will be depreciated using the straight-line method for six years and a zero salvage value. Although, the equipment is believed to be able to be sold at the end of the project for $1.8 million.…

    • 1938 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    John Hildreth was the sole shareholder, director, and officer HCE, Inc, a corporation in New Jersey. HCE-NJ began to do business in Maryland in early 1997. According to the Maryland code, it is required for foreign corporations to register with the Maryland Department of Assessments and Taxation before doing intrastate business in Maryland, and it is required to have a resident agent in Maryland.…

    • 863 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Case Study

    • 530 Words
    • 3 Pages

    The Big “O” Company manufactures large hydraulic units. One of the most difficult items to manufacture is the hydraulic cylinder. The cylinder housing is fabricated from a malleable iron casting. The housing is machined to close tolerances, and the slightest discrepancy in either material or machining means a total loss. Machine cycle time on a typical housing is approximately sixteen hours. For several years, castings had been purchased from the Macon Foundries in Georgia. Macon had been a Big “O” supplier for many years, and during that time it produced thousands of castings at acceptable quality levels. Eight months ago, however, when its founder and president, George Chapel, died, Macon announced that it was discontinuing foundry operations. The supply department at Big “O” undertook a search for new sources. At first, few suppliers could be found who were either capable or willing to meet the exacting specifications and tolerances required. Ultimately, however, three foundries were selected and invited to submit bids on 4,000 castings. The low bidder, at $76.17 a unit, was the Barry Foundry of Muncie, Indiana. Barry was a small concern with a good reputation for doing quality work and fulfilling every delivery promise. Barry was given a purchase order for the full 4,000 units, with the stipulation that Big “O” approve the first 100 units. Within two weeks the first 100 castings were received. They were subjected to initial inspection and then dispatched to the floor for machining. In the words of the shop foreman, “They machined like butter.” Barry was told to proceed with the entire order and a four-month delivery schedule. It was about this time that problems began to develop in the shop. Some hard castings had damaged both grinding wheels and cutting tools. Also, cracks from casting porosity appeared on newly machined surfaces and slots. Although these conditions were not present in all castings, they occurred in a sufficient number to…

    • 530 Words
    • 3 Pages
    Good Essays