Operational Efficiency & Operational Optimization

Sa – Situation Anlysis

Pa – Problem Analysis

Da – Decission Analysis

Pa – Probabilty Analysis

1) Suppose that a peak harvest-season day involves 18,000 barrels of berries, 70% of them wet harvested, arriving uniformly over a twelve-hour period from 7 a.m. to 7 p.m., and process initiates as soon as the first truck arrives.

a) At what time during the day, would the trucks start queuing up to upload?

Answer: - Trucks carrying wet berries will have to wait to unload during the day because the incoming arrival rate is 1050 is greater than processing rate 600. The Trucks arriving with dry berries will not have to wait as processing is greater than arrival. Also, if Maximum storage capacity is been used for storing wet berries then total available will be 3200 bbls. Assuming all storage was empty @ 7:00 A.M , trucks delivering wet berries would have to start waiting after 10:00 A.M as the bins would be full (3200/1050 – 3.04 hours) Also, the Processing will be completed at 4:00 A.M on Peak Harvest Day assuming that work will start at 7:00 A.M

This has been assumed with following Logic – Considering that each truck carried the same number of Barrels; 1500 barrels (18,000/12) are delivered every hour over a period of 12 hours. Each truck will contain 1050 barrels (70%) of wet berries and 450(30%) barrels of dry berries. Thus, the total input for the day will be 12,600(70% of 18000) of wet berries and 5400(30% of 18000) of dry berries.

Since the process capacity is of bottleneck, the capacity of the cranberry process is 600 bbls/hour. Also, we have to take note that only wet berries go through the drying process and thus the processing of the dry berries are not affected by this. The process capacity of processing dry berries alone would be 1200 bbls per hour (Bottleneck = Quality Grading). However, even with the capacity of 1200 bbls per hour, all dry berries received

You May Also Find These Documents Helpful

  • Good Essays

    ECO 550 FINAL EXAM

    • 1177 Words
    • 4 Pages

    7. A plant manager is attempting to determine the production schedule of various products to maximize profit. Assume that a machine hour constraint is binding. If the original amount of machine hours available is 200 minutes., and the range of feasibility is from 130 minutes to 340 minutes, providing two additional machine hours will result in the:…

    • 1177 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    3. Suppose that a peak harvest-season day involves 18,000 barrels of berries, 70% of them wet harvested, arriving uniformly over a…

    • 1037 Words
    • 5 Pages
    Satisfactory Essays
  • Powerful Essays

    Dermaplus Analysis

    • 1521 Words
    • 7 Pages

    Information in terms of the recommended average daily production capacity in units for the next 12 months will be provided in order to set the size of the plant’s unionized workforce. The assumption is the quantity of units identified used to set the size of the workforce will maximize daily profit.…

    • 1521 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    On average, 18000 barrels arrive over the 12hr span that the business is open. This means approximately 1500 barrels of berries are input into the process per hour (18000barrels/12hrs). The capacity of the Kiwanee dumpers was given as 3000 b/hr., and I was able to calculate the implied utilization by dividing the berry input rate by the capacity(1500bbl/hr divided by 3000bbl/hr). To calculate the actual utilization of the dumpers, you must first determine the flow rate of the system. Only 25% of the berries are dry and 75% are wet. This sums to 375 dry berries per hour (1500 input/hr x.25) and 1125 wet berries per hour (1500 input x .75). The dry berries have 16 bins that hold 250 barrels a piece, adding up to a total of 4000 berries that can be stored. The wet berries have 8 bins that hold 250 barrels and 3 bins that hold 400 barrels, adding up to 3200 barrels total for storage. The capacity of the DeStoners was given as 1500bbl/hr. The implied utilization would be the input rate (1500bbl/hr) divided by the capacity (1500 bbl/hr). Since the bottleneck does…

    • 1003 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Bob goes to school

    • 273 Words
    • 2 Pages

    capacity and utilization of each of the operations. Show the flows of wet and dry berries…

    • 273 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    The demand for and production of cranberries is uneven. The seasonal nature of cranberry harvesting creates a need for a flexible system that can utilize full capacity in harvesting season and minimize loss from excess capacity during off season. NCC current system at Receiving Plan #1 is not meeting the input levels. NCC has two immediate options: increase the temporary…

    • 1103 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Exam 2 Operations Management

    • 2658 Words
    • 11 Pages

    Best operating level is the volume of output at which average unit cost is minimized.…

    • 2658 Words
    • 11 Pages
    Good Essays
  • Powerful Essays

    On an average busy day, 18,000 bbl arrive over the 12-hr period. Thus, we can say that 1,500 bbl arrive every hour. Since 75% of the berries are wet berries, 1,125 bbl of wet berries and 375 bbl of dry berries arrive every hour. These berries are dumped into 5 Kiwanee Dumpers that take 600 bbls per hour each.…

    • 1348 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Employment and Wage Rate

    • 670 Words
    • 3 Pages

    Sam owns a candy factory and hires workers in a competitive labor market to case the bags of candy. His company's weekly output of cases of candy varies with the number of workers hired, as shown in the table:…

    • 670 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    BUS 475 Sample Final Exam

    • 4935 Words
    • 20 Pages

    Jaime Inc. manufactures 2 products, sweaters and jackets. The company has estimated its overhead in the order-processing department to be $180,000. The company produces 50,000 sweaters and 80,000 jackets each year. Sweater production requires 25,000 machine hours, jacket production requires 50,000 machine hours. The company places raw materials orders 10 times per month, 2 times for raw materials for sweaters and the remainder for raw materials for jackets. How much of the order-processing overhead should be allocated to jackets?…

    • 4935 Words
    • 20 Pages
    Good Essays
  • Satisfactory Essays

    Trend shows that percentage of water harvested berries that currently stands at 70% of the berries delivered to the plant will keep increasing in the future. In our existing set up the dryers that process wet berries are a bottleneck at 600bbls/hr capacity. Our analysis recommends installation of 2 additional driers which will augment the drying capacity to 1000bbls/hr. This will be in line with forecast that quantity of wet berries arriving at the plant will increase in the coming time.…

    • 1177 Words
    • 5 Pages
    Satisfactory Essays
  • Good Essays

    2. We assume we are open 4 hours each night. Using Question 1, we know we need 16 + 10xN minutes to fill a N dozens rush order. We want to maximize N knowing we have to have 16 + 10xN < 240. We easily find N = 22. We can fill 22 orders in a night.…

    • 1260 Words
    • 6 Pages
    Good Essays
  • Good Essays

    Spmproject File

    • 667 Words
    • 3 Pages

    * Each hour, there are (1500*0.7) = 1050bbls of wet berries and (1500*0.3) = 450 of dry berries.…

    • 667 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Ncc Case

    • 1281 Words
    • 6 Pages

    The Truck arrival rate is at 20 Trucks/Hr. This year based on the numbers there is going to be 70% Wet and 30% Dry Berries.…

    • 1281 Words
    • 6 Pages
    Good Essays
  • Good Essays

    Mushroom Spawn Production

    • 1652 Words
    • 7 Pages

    (1) To produce 200 spawn bottles of two shift i.e. 5,000 bottles of spawn assuming 25 working days per month.…